Marches Renewable Energy Project (MarRE)

MarRE is a grant scheme allowing eligible applicants based in the Marches to apply for a 50% grant toward new installations of renewable technologies on their premises.

edit
Save this page for reference and share it with your colleagues

MarRe LogoLogoERDF_Col_Landscape_2017_copy_web_

Installations ranging from 4kWp to 200kWp (system kilowatt peak) can be supported.

The renewable energy generated should be used by the applicant.

Eligible applicants:

• Local Authorities

• Statutory and non-statutory public funded organisations/bodies

• Higher and Further Education Institutions

• Voluntary/community organisations

• Registered charities and not-for-profit organisations

• Small and medium sized enterprises with less than 250 employees

Eligible applicants must be located in the Marches local authority areas of Herefordshire, Shropshire, and Telford & Wrekin.

Qualifying renewable technologies:

• Wind

• Solar

• Aerothermal – including air source heat pumps

• Geothermal – including ground source heat pumps

• Hydrothermal

• Hydropower

• Biomass

• Landfill gas

• Sewage treatment plant gas and biogases

NOT eligible:

X Domestic and residential properties

X Primary agriculture

X Landlords

X New builds

X Costs incurred before grant approval

X Retrospective applications

X Applicants with less than a 5 year lease on the installation premises

X Installations of less than 4 kWp and larger than 200kWp

Case studies

The project is well underway and you can see the case studies for our first installations here:

Barton Court, Malvern, Herefordshire
Edmo Engineering, Ross-on-Wye, Herefordshire
Frank H Dale Ltd, Leominster, Herefordshire
Goodrich CE Primary School, Herefordshire
Queenswood Country Park, Herefordshire

How to apply

Please note we are currently closed to expressions of interest from potential applicants based in Herefordshire only, as we currently have more interest than funding available.  We will update this webpage with further information in due course.

A two-stage application process has been developed to try to ensure a quick turn-around in the decision making process.

1. Applicants should firstly complete an expression of interest form.

2. Applicants whose expressions of interest are considered eligible will be sent full application forms which, once submitted, will be assessed by the project steering group.

Please complete the expression of interest form and return to:

[email protected]

If you would like to discuss your proposal before completing the form please contact:

Adrian Marshall, MarRE Project Manager on 01432 260064.

The Expression of Interest Form can also be downloaded here.

Contact us about Marches Renewable Energy Project (MarRE)

  • You won't receive lots of emails, and you can unsubscribe at any time.
  • By submitting my details, I consent for Marches Growth Hub to process my data for the purposes described in the Privacy Policy.

phone

Herefordshire

01432 261758

Shropshire

01743 250526

Telford & Wrekin

01952 567589

or email us direct

[email protected]